Optimization of long-term cement quarry production schedule using mixed integer linear programming

https://mij.hoimovietnam.vn/en/archives?article=21023
  • Affiliations:

    1 Trường Đại học Mỏ-Địa chất
    2 Institute of Mining Science and Technology - Vinacomin

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 12th-Jan-2021
  • Revised: 19th-Feb-2021
  • Accepted: 30th-Mar-2021
  • Online: 30th-Apr-2021
Pages: 20 - 26
Views: 112
Downloads: 0
Rating: , Total rating: 0
Yours rating

Abstract:

Production scheduling optimization techniques have not become common in cement quarry mining. This research sought to present and implement a new optimization model based on Mixed Integer Linear Programming (MILP) along with an efcient solution method to address the long-term cement quarry production scheduling problem. A multi-step method was applied to solve the long-term cement quarry production scheduling problem (LCQPSP) and nding a starting integer feasible solution (SIFS). The implementation of the model and the solution method at a cement quarry shows their ability to generate practical schedules in a reasonable time

How to Cite
Tran, B.Dinh, Nguyen, T.Anh, Pham, V.Van, Nguyen, A.Dinh, Nhu, P.Van and Doan, T.Van 2021. Optimization of long-term cement quarry production schedule using mixed integer linear programming (in Vietnamese). Mining Industry Journal. XXX, 2 (Apr, 2021), 20-26. .
References

1. Asad, M.W.A., (2008). Multi-period quarry production planning through sequencing techniques and sequencing algorithm. Journal of Mining Science, 44 (2),206–217.

2. Asad, Mohammad Waqar Ali.,(2011) “A heuristic approach to long-range production planning of cement quarry operations.” Production Planning & Control 22.4: 353-364.

3. Askari-Nasab, H., Awuah-Offei, K., & Eivazy, H. (2010). Large-scale open pit production scheduling using mixed integer linear programming. International Journal of Mining and Mineral Engineering, 2,

185–214.

4. Bley, A., Boland, N., Fricke, C., & Froyland, G. (2010). A strengthened formulation and cutting planes for the open pit mine production scheduling problem. Computers & Operations Research, 37(9),

1641–1647.

5. Srinivasan, S. and Whittle, W., (1996). Combined pit and blend optimization. Society of Mining, Metallurgy, and Exploration, Inc. Annual Meeting, Phoneix, AZ.

6. Tolwinski, B., (1998) Scheduling production for open pit mines, in Proceedings of APCOM’98, , pp. 19 – 23.

7. Whittle, J., (1989), The Facts and Fallacies of Open Pit Optimization, 1989 (Whittle Programming Pty Ltd: North Balwyn, Victoria).

Other articles