Analysis of tunneling capacity by discrete simulation for multiphase driving method

https://mij.hoimovietnam.vn/en/archives?article=21035
  • Affiliations:

    Học viện Kỹ thuật Quân sự

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 11st-Feb-2021
  • Revised: 25th-Feb-2021
  • Accepted: 30th-Mar-2021
  • Online: 31st-July-2021
Pages: 30 - 36
Views: 115
Downloads: 0
Rating: , Total rating: 0
Yours rating

Abstract:

The multiphase driving method for tunneling is conventionally considered as the unavoidable approach for large-size underground constructions and the limitation of equipment. Currently, this approach is adjusted to be an option which can be implemented for economical analysis. In this study, discrete simulation is conducted for analyzing the productivity with various multiphase driving options. The case study, which uses information of on-site available equipment, is implemented for Đèo Cả tunnel with phase division options are proposed and simulated. Result from case study reveals that the multiphase driving with the plan that the face is equally devided can boost the velocity of tunneling compared to the full-phase method. However, the uncertainties in the candidate options are the critical factor for the decision making process. Keywords:?tunnel, underground, discrete simulation, excavated speed, drill and blast

How to Cite
Nguyen, T.Tien, Do, T.Nhu, Bui, N.Duc and Tran, B.Anh 2021. Analysis of tunneling capacity by discrete simulation for multiphase driving method (in Vietnamese). Mining Industry Journal. XXX, 3 (Jul, 2021), 30-36. .
References

1. Reilly (2000), The management process for complex underground and tunneling projects. Tunneling and Underground Space Technology 15(1), pp.31-44.

2. Spackova O. (2012), Risk management of tunnel construction projects, Doctoral Thesis, Czech Technical University in Prague, Prague.

3. Markus Scheffer and Ruben Duhme (2018), Construction Process Simulation in Tunnel Construction - A Prerequisite for Automation, Proceedings of the 35th ISARC, Berlin, Germany, pp.1139-1144.

4. Nguyễn Tiến Tĩnh, Đỗ Như Tráng, Bùi Đức Năng (2021), Sử dụng phần mềm EZStrobe mô phỏng quá trình đào hầm bằng phương pháp khoan nổ, Tạp chí Địa kỹ thuật, số 1/2021.

5. Đỗ Như Tráng (2001), Giáo trình thi công công trình ngầm, Học viện KTQS.

6. Nguyễn Tiến Tĩnh, Bùi Đức Năng, Trần Anh Bảo (2019). Sử dụng mô hình xác định đánh giá ảnh hưởng của các yếu tố đầu vào đến tốc độ của quá trình thi công hầm bằng phương pháp khoan nổ. Tạp chí Người Xây dựng, số tháng 9 & 10/2019, tr.52-54.

7. Trần Tuấn Minh (2015), Đánh giá hiệu quả xây dựng đường hầm giao thông tiết diện lớn thi công bằng sơ đồ chia gương, Tạp chí Công nghiệp mỏ, số 3, tr.23-29.