Ứng dụng số liệu đo biến dạng vào tính toán véc tơ trạng thái chuyển động của khối trong phân tích biến dạng không liên tục

- Authors: Nguyen Quoc Bao 1, Nguyen Van Tuan 1, Cao Chu Quang 2
Affiliations:
1 University Of Transport Technology,
2 Military Technical Academy
- Received: 15th-Nov-2015
- Online: 30th-June-2016
Abstract:
In the discontinuous deíormation analysis, deíormation is an important unknown quantity of the block. Detormation is calculated by the analysis program of FDDA forward probíem or the program analysis of BDDA backward problem. For the backward analysis the detormation measurements will be used as input data to calculate the deíormation of the block. This paper presents algorithms, calculation programs of the block deformation from the measured results.

1. French Society for Trenchless Technology. Microtunneling and Horizontal Drilling: Recommendations. John Wiley & Sons, 2004.
2. Mohamed, Y. H. and R. s. Gary (2007). Delay time analysis in microtunneiing projects. Journal of Construction Engineering and Management 133(2), 191-195.
3. Stein, D. (2005). Practical Guideline for the Application of Microtunneiling Methods. Bochum, Germany. ISBN: 3-9810648-0-1.
Other articles