Research on structure and dynamics calculation of the trailer bogie of the CRH2 high-speed train

https://mij.hoimovietnam.vn/en/archives?article=23065
  • Affiliations:

    University of Transport

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 16th-Oct-2023
  • Revised: 15th-Nov-2023
  • Accepted: 18th-Nov-2023
  • Online: 31st-Dec-2023
Pages: 32 - 38
Views: 135
Downloads: 1
Rating: , Total rating: 0
Yours rating

Abstract:

Train structure and dynamics calculations have long been of research interest. Especially, the North-South high-speed railway project is being researched for implementation. The article studies the typical trailer bogie structure of the CRH2 high-speed train. Thereby, it has conducted research on the dynamic model of the trailer, calculated the dynamics, and evaluated the operational stability criteria of the trailer. The results are not only reference documents but also have practical significance for the North-South high-speed railway project.

How to Cite
Mai, T.Van and Nguyen, H.Trung 2023. Research on structure and dynamics calculation of the trailer bogie of the CRH2 high-speed train (in Vietnamese). Mining Industry Journal. XXXII, 6 (Dec, 2023), 32-38. .
References

1. Lã Ngọc Khuê (2015). Động lực học vận hành của Đầu máy toa xe. Nhà xuất bản Bách khoa Hà Nội.

2. Nguyễn Hữu Dũng (2006). Động lực học đầu máy Diesel. Nhà xuất bản Giao thông vận tải, Hà nội.

3. Khuất Tất Nhưỡng (2002). Đầu máy Toa xe hiện đại. Nhà xuất bản Giao thông vận tải, Hà nội.

4. Thương Diệu Tiến, Mai Văn Thắm, Đỗ Việt Dũng (2017). Thiết kế và kết cấu đoàn tàu động lực. Nhà xuất bản Giao thông vận tải, Hà nội.

5. Zhang ShuGuang (2008), Study on testing and establishment method for the load spectrum of bogie frame for high-speed trains, Science in China Series E: Technological Sciences.

6. Amtrak and

Other articles