Nghiên cứu ứng dụng năng lượng mặt trời và hòa đồng bộ lưới điện 6 kV ở các xí nghiệp mỏ vùng Quảng Ninh

- Authors: Ho Viet Bun
Affiliations:
Hanoi University of Mining and Geology
- *Corresponding:This email address is being protected from spambots. You need JavaScript enabled to view it.
- Received: 5th-July-2017
- Revised: 25th-Oct-2017
- Accepted: 10th-Dec-2017
- Online: 31st-Dec-2017
Abstract:
Vietnam is located in a tropical ciimate with many favorable conditions for solar energy using, supplying and synchronize with the electrical distribution network of mining enterprises. The paper proposes a general scheme of the overall power supply system to the mine where simultaneous using the solar energy provides direct synchronization of the 6 kV bus bar station and the results of research on interconnected problems to meet the power supply indicators.

1. Vu Phong, http://solarpower.vn/cuong-do-buc-xa-nang-luong-mat-troi-tai-cac-khu-vuc-viet-nam/. 2016.
2. Havard Breisnes Vika. Modelling of Photovoltaic Modules with Battery Energy Storage in Simulink/Matlab. Master thesis. Norwegian University of Science and Technology. 2014.
3. Mathworks, 2015. Examples of PV array.
' 4. Moacyr A.G. de Brito at el. Comparative analysis of MPPT Techniques for PV Applications. Clean Electrical Power (ICCEP) (p.99-104). International Conference, IEEE. 2011.
Other articles