Some solutions for support during roadway excavation through the faults and application in the Mao Khe coal mine

https://mij.hoimovietnam.vn/en/archives?article=22045
  • Affiliations:

    1 Trường Đại học Mỏ-Địa chất
    2 Vietnam Mining Science and Technology Association

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 25th-Aug-2021
  • Revised: 15th-Oct-2021
  • Accepted: 10th-Feb-2022
  • Online: 31st-Aug-2022
Pages: 35 - 41
Views: 66
Downloads: 0
Rating: , Total rating: 0
Yours rating

Abstract:

The paper introduces some solutions to sta bility of the roof and side roadway during excavations through the fault, and experience in practical application during excavation through F.cb fault of Mao Khe coal mine.

How to Cite
Dao, D.Viet and Le, P.Thanh 2022. Some solutions for support during roadway excavation through the faults and application in the Mao Khe coal mine (in Vietnamese). Mining Industry Journal. XXXI, 4 (Aug, 2022), 35-41. .
References

1. Công ty than Mạo Khê – TKV (2017), Giải trình địa chất bổ sung đứt gãy F.cb, 2017.

2. Công ty than Mạo Khê – TKV (2017), Thuyết minh hộ chiếu đào chống lò lò dọc vỉa đá vỉa 9b Đông mức -150, 2017.

3. Công ty than Mạo Khê – TKV (2017), Bản vẽ thi công chống giữ đường lò qua phay F.cb. 2017.

4. 煤炭专业编委会. 最新矿山井巷工程施工综合技术与规范实用手册. 吉林电子出版社.2005年3月.

5. 全国职业培训教学工作指导委员会煤炭专业委员会编. 巷道掘进. 煤炭工业出版社. 2006年.

6. https://www.sohu.com/a/246711314_100174806. 隧道支护超前小导管三种制作方法.