Abstract:

The use of TBMs for mining projects has not been wilhout its fair share of challenges. Any simplitied perception Ihat TBMs cannot be used for mining projects is false, as it is subject to geological risk. Theretore, wilhin the paper outlines the key technical issues that need to be considered for the use of TBMs for mining projects, the advantages and disadvantages of the use of TBMs, some minimum requirements for their use and some unique approaches for geotechnical investigations required for the Iheir use.

How to Cite
Dang, T.Trung 2019. Một số lưu ý khi sử dụng máy đào hầm trong các dự án khai thác mỏ (in Vietnamese). Mining Industry Journal. XXXIII, 2 (Apr, 2019), 26-31. .
References

1. Alexander c., 1999, “Development of stillwater Mining Company's east boulder project using tunnel boring technology,” SME Annual Mẹeting, 1999, Denver, co, 99-35.

2. Brox D.R. 2012, “Evaluation of Overstressing of TBM Excavated Tunnels in British Columbia,” Tunneiing Association of Canada Coníerence, Montreal.

3. Brox D.R. 2013, “Evaluation of Overstressing of Deep Hard Rock Tunnels," International Tunneling Association Congress, Geneva.

4. Bullock R.L., 1994, “Underground hard rock continuous mining,” Mining Engineering, Vol. 46, No 11 pp. 1254-1258. '

5. Cigla M., Yagiz s., and Ozdemir L.,‘2001, “Application of tunne! boring machines in underground mine development,” 17th International Mining Congress of Turkey.

6. Luxner T., 2012, “Use of tunnel boring machines at the stillvvater Mining Company’s underground PGM mines,” SME Publication.

7. Rostami J., 1997, “Issues related to selection, design optimization, and períormance prediction of tunnel boring machines (TBM) for mining applications,” SME Annua! Meeting, 2012, Seattle, WA, 12-067.

8. Tilley c., 1989, “Tunnel boring at the stillwater Mine Nye, Montana,” Rapid Excavation and Tunnẹling Coníerẽnce Proceedings, Chapter 29.