Xây dựng phương pháp xác định thời gian làm việc của tổ hợp thiết bị theo các yếu tố tiềm ẩn gây bất lợi khi khai thác lò chợ cơ giới hóa

Affiliations:
1 Hanoi University of Mining and Geology
2 Dong Bac Corporation
- Received: 12th-Feb-2019
- Revised: 10th-June-2019
- Accepted: 10th-Aug-2019
- Online: 1st-Sept-2019
- Section: Mining
Abstract:
The content of the paper determines the influence of geological íactors to the mechanized longwall kiln based on the vveight and hierarchical analysis process to determine the importance of mine íactors. geology to the mechanized market oven. At the same time, building a method to caículate the effective vvorking time in the structure of the mechanized iongwall kiln production organization.

1. Vũ Trung Tiến. Nghíêri cứu công tác tổ chức khấu than bằng máy liên hợp trong lò chợ dài ờ mỏ than vùng Quảng Ninh, Luận văn Thạc sĩTrường Đại học Mỏ - Địa chất, 2007,
2.-Zfiang Dongsheng, etc. The ANN inserted ES fof the pattern selection of coal mining technology. Proceeđing of the’96 internationl, symposinm on mining Science and technogoly, Xuzhou, Jiangsu, CHINA, 1996. 10.
3. Edyta Brzychczy, Piotr Lipinski. Knowledge-based modelìng and multi-objective optimization of production in underground coal mines, GH Journal of Mining and Geoengineerìng. Vol. 37. No. 1. 2013.
4. Vayenas N., Yurij G. Using Gen Re! for reiiability assessmení of mining equipmení. Journaỉ of Quality in Maintenance Engineering. Emerald, vol. 13, no. 1,2007.
5. Guo H., Zhu K.t Ding Ch., Li L.: intelligent optimization for project scheduling of the first mining face in coal mining. Expert Systems with Application, vo!. 37, iss. 2, 2010, pp. 1294-1301
6. G.J. Sheng, Q.s. Sun, and H.L. Song, “The innovationaỉ mining technology of fully mechanized mining on thin coal seam,”Journal of China Coaỉ Society, vo!. 32, Ne 3, pp. 230-234, 2007.
7. Caí Zhuangyang, Zhou Wei. Reliability assessment method in underground mining systerm, China technology of mining university, 2014.
Other articles