Application of numerical simulation in determining pressure to create mail crack between blastholes in presplitting blasting at Sin Quyen copper mine

https://mij.hoimovietnam.vn/en/archives?article=22021
  • Affiliations:

    1 Hanoi University of Mining and Geology, Hanoi
    2 Chi nhánh mỏ tuyển đồng Sin Quyền, Lào Cai- Vimico

  • *Corresponding:
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Received: 23rd-Dec-2021
  • Revised: 15th-Feb-2022
  • Accepted: 7th-Mar-2022
  • Online: 30th-Apr-2022
Pages: 5 - 10
Views: 90
Downloads: 0
Rating: , Total rating: 0
Yours rating

Abstract:

According to proposed plan, Sin Quyen copper mine will extract more deeply by surface mining method to level -400m. This means the mine will go deeper about 200 m in comparison with the suggested final bottom at the Eastern area of the mine at level -188 m. An important problem that the mine need attention is to mine safely and effectively. The stability of benches and final pit slopes when mining deeper has an important meaning to the mine. Presplitting blasting is the solution that has been effectively applied for this purpose. This paper presents an approach for determining presplitting parameters that based on the numerical simulation by finite element method by Phase2, with the input data from properties and characteristics of rock at Sin Quyen copper mine. The presplitting borehole with the diameter of 127mm is put in to examine; the spacings between presplitting blastholes in rock layers above and below ore body are calculated with the values of 0.5m, 1.0m, 1.5m, 2.0 m, respectively. From the numerical simulation results to study the relation between pressure and spacings, it can be seen that the required blasting pressure inside the blasthole to create main crack between presplitting blastholes is from 210 MPa. From the the analyzing results, the required blasthole pressure in relation with spacing of presplitting blastholes and rock properties. This can be used for determining charge weight and structure of presplitting charges

How to Cite
Pham, H.Van, Pham, V.Van, Tran, B.Dinh, Nguyen, A.Dinh and Dinh, T. 2022. Application of numerical simulation in determining pressure to create mail crack between blastholes in presplitting blasting at Sin Quyen copper mine (in Vietnamese). Mining Industry Journal. XXXI, 2 (Apr, 2022), 5-10. .
References

1. Đặng Hồng Thắng, Bùi Duy Nam (2021), Nghiên cứu lựa chọn phương án khai thác hợp lý phần sâu mỏ đồng Sin Quyền, Thông tin Khoa học Công nghệ Mỏ, Số 3–2021.

2. Đỗ Ngọc Tước, Đoàn Văn Thanh, (2021), Giải pháp công nghệ phù hợp khi khai thác các tầng sâu ở mỏ than lộ thiên Việt Nam, Thông tin Khoa học Công nghệ Mỏ, Số 1-2021.

3. Lưu Văn Thực, Dương Trung Tâm, Vũ Đình Trường (2014), Nghiên cứu lựa chọn công nghệ nổ mìn hợp lý nhằm nâng cao ổn định bờ mỏ khi khai thác xuống sâu các mỏ quặng sắt, Thông tin Khoa học Công nghệ Mỏ, Số 10- 2014.

4. Phạm Văn Việt, Lê Thị Minh Hạnh (2014), Nghiên cứu đề xuất hình dạng bờ mỏ hợp lý cho mỏ lộ thiên khai thác xuống sâu ở Việt Nam, Tạp chí Công nghiệp Mỏ, Số 4-2014.

5. N. D. An, P. T. Hop, L. C. Dien, T. Q. Hieu, and T. D. Bao (2020), Design of pre blasting (pre-splitting) in Tan Cang quarry no.1 in Vietnam, Inz. Miner., vol. 1, no. 1, pp. 155–162, 2020, doi: 10.29227/IM- 2020-02-20.

6. P. V. A. N Viet, N. A. N. H. Tuan, and P. V. A. N. Hoa (2020), Finite Element Method Application to Determine Appropriate Splitting Parameters for Dimensional Stone Quarries, Inz. Miner. J. Polish Miner. Enginerring Soc., vol. 46, no. 2, pp. 95–103, 2020, doi: doi.org/10.29227/IM-2020-02-13.

7. Phạm Quốc Huy (2020), Báo cáo kết quả thăm dò bổ sung nâng cấp trữ lượng phần sâu đến mức-600 m, mỏ đồng Sin Quyền, huyện Bát Xát, tỉnh Lào Cai, 2020.

Other articles